top of page

Road markers at Frodsham Wind Farm

NW Groundwork returned to Frodsham wind farm, this time to install road markers alongside the wind turbine access roads.


NW Groundwork returned to Frodsham Wind Farm, this time to install road markers alongside the wind turbine access roads.

As the wind farm is situated in an isolated upland location, it is subject to extreme winter weather conditions. For vehicle safety in fog and blizzards, 20 marker posts were installed on the side of the internal track.



 For vehicle safety in fog and blizzards, 20road marker posts were installed on the side of the internal track

 For vehicle safety in fog and blizzards, 20road marker posts were installed on the side of the internal track

 For vehicle safety in fog and blizzards, 20road marker posts were installed on the side of the internal track

 For vehicle safety in fog and blizzards, 20road marker posts were installed on the side of the internal track

© NW Groundwork & Civils Ltd. 2024  
Website design by Cat Lund

Company Registration No: 10931527 registered in England and Wales

5 Park Gate Hamelden Road Hapton BB11 5QW

bottom of page